Home / Cooperation

One joint operation

First the terminal’s task. Then the technological scheme, responsibility and commercial terms.

Who does what

Clear split of responsibility

The terminal keeps its berth and its cargo. We bring a working loading operation to it.

Terminal

  • Berth
  • Infrastructure
  • Cargo flow and schedule
  • Coordination of services

Mir Novy

  • Technological scheme
  • Equipment
  • Personnel
  • Loading and support
Payment per tonne actually loadedOur result is tied to the terminal’s real operations, not to the sale of a piece of equipment.
Why this model

Capacity, not a purchase

The terminal gets additional working capacity without buying, owning or staffing new equipment.

01

Paid for the result

Commercial terms are tied to tonnes actually loaded onto the vessel.

02

Equipment and crew on our side

We bring the machinery, the personnel and the support for the operation.

03

No stranded investment

If the scheme doesn’t fit, the port isn’t left with unsuitable purchased equipment.

We start with a real task, not with buying equipment

One berth. One flow. One pilot.

That is enough to understand the real effect of the technology at your terminal.

Berth inspection

We look at the berth and the existing loading setup on site.

Cargo flow

Together we select one specific cargo flow for the pilot.

Configuration

We choose the equipment configuration for that berth and cargo.

Agreed parameters

Throughput, safety and loading quality are agreed in advance.

Pilot & evaluation

We run the pilot operation and evaluate the result together.

If the scheme works, we scale it by adding feeders and extending the line. If not, the port isn’t left with unsuitable purchased equipment.

After the pilot

Scale a proven scheme

Once the result is confirmed, throughput grows by adding feeders and extending the technological line — provided the cargo supply is stable and sufficient.

Throughput details

Feeder 1stable feed
Feeder 2added when the scheme is confirmed
Conveyor to the vesselloading & distribution in the hold
500–600 t/h1,000–1,200 t/h
To start the conversation

What helps us prepare a scheme

Share what you can — we’ll prepare a project-specific technological scheme for your technical team.

01

The berth

Which berth could host the additional line and how it is used today.

02

The cargo flow

What cargo, from which transport and in what volumes.

03

The schedule

When the additional capacity is needed — season, contract or ongoing.

Next step

Let’s find where we can strengthen your terminal.

We choose one berth and one real cargo flow. Then we prepare a project-specific technological scheme for your technical team.

Message us on WhatsApp [email protected] WhatsApp: +44 7715 515022  ·  Email: [email protected]